Start-up / Commissioning | November 2018 |
---|---|
Capacity | 498 SCFM of biogas (800 Nm³/hr raw biogas) – future: 747 SCFM of biogas (1,200 Nm³/hr raw biogas) 311 SCFM of RNG (500 Nm³/hr biomethane) – future: 623 SCFM of RNG (1,000 Nm³/hr biomethane) |
Methane concentration in raw biogas | 55% |
Methane concentration in product gas | Standard: 97% without THT odorant directly supplied to neighbouring factory Potential of: 89% with THT odorant supplied to national gas grid |
Efficiency | 99,5% |
Type Installation | Indoor |
Veendam, Netherlands
Bright Biomethane engineered a multifunctional biogas upgrading system which easily alternates between two methane concentrations of Renewable Natural Gas, with or without THT odorant injection.
The pure product gas (RNG) with 97% methane concentration and without THT odorant is supplied directly to the neighbouring magnesium salt factory. The THT odorized biogas with a methane concentration of 89% can be supplied to the national gas grid to guarantee receipt of biogas when the magnesium salt factory is not able to do so.
The biogas upgrading system produces over 141 million ft³ (4 million Nm³) of RNG annually (311 SCFM), that will be in the near future expanded to over 282 million ft3 of RNG anually.